Role: Site Planner & Material Controller | Ref.: 1119-ADVT-GFS-TZ-ELE-Site Planner & Material Controller | EITS Contractor: Electrical & Instrumentation Scope on the EACOP Project

roomTanga

business_centerFull Time

book Direct Reports

bookmark Intermediate

directions_carDriving License Not Required

flagOpen to Expatriates & Local Nationals

businessElectric Utilities

Engineering

Summary

The Site Planner and Material Coordinator is responsible for scheduling field service interventions with full visibility on technical, material, and personnel availability; coordinating material delivery, tracking, and storage across the site; ensuring alignment between planning, procurement, field operations, and customer commitments; and supporting documentation control while contributing to resource and material optimization.

Location: Tanga

Responsibilities

  • Schedule all work orders (using bFS or other tools), ensuring accurate data (customer info, scope of work, priority, timing). 
  • Prioritize interventions based on SLA, criticality (VIP/non-VIP), and technician/subcontractor availability. 
  • Assign all possible work orders for at least 3 months ahead to improve field team utilization and reduce downtime. 
  • Track and manage material flow and logistics, ensuring availability of tools, spare parts, and equipment before execution. 
  • Prepare daily/weekly plans in collaboration with Execution Manager and Logistics to minimize bottlenecks. 
  • Monitor execution and reschedule/cancel interventions as needed. 
  • Follow up with subcontractors and Schneider teams for on-time material dispatch and site deliveries. 
  • Participate in daily/weekly meetings to align with the Field Services Execution Team and Project Management. 
  • Maintain documentation and test procedure files, and support ITP and material submittal process. 

Main Interactions 

  • Order Management 
  • Customers & FSRs 
  • Field Services Operations Director 
  • Technical Support 
  • Supply Chain & Procurement 
  • Logistics Manager 
  • Finance 

Key Success Factors 

  • Strong interpersonal and communication skills 
  • Scheduling and material coordination knowledge 
  • Understanding of FSR utilization, cost control, and project planning 
  • Attention to detail and proactive follow-up 
  • Basic knowledge of Schneider product portfolio 

Education and Qualifications

  • Associate or Bachelor’s degree in Engineering, Supply Chain, or equivalent 

Requirements

  • 1–2 years minimum experience in field service planning or materials coordination 
  • Proficiency in MS Office and scheduling tools (Primavera, MS Project, etc.) 
  • Knowledge of Schneider Electric Field Services business preferred 
  • Strong analytical, planning, and documentation skills 
  • Experience in Customer Care or Field Service logistics is a plus 

Characteristics

Performance Measurement (KPIs) 

  • Safety KPI adherence 
  • % Work Order Scheduled 
  • FSR Utilization Rate 
  • Work Order and Material Delivery Timeliness 
  • Time Deviations (Planner and FSR) 
  • Preventive Maintenance Scheduling Rate 
  • Customer satisfaction through NSS metrics 

-

-

-

Electric Utilities: 2 Years

-

-

Engineering: 2 Years

-